
The AI Cowboys
Not pro. Not anti. Pro evidence.
We do not believe San Antonio should blindly approve data centers. We also do not believe San Antonio should blindly reject them.
- Pro evidence.
- Pro engineering.
- Pro transparency.
- Pro community.
- Pro innovation.
Those positions are compatible. The message: understand exactly what is being proposed, what it consumes, what it produces, who pays, who benefits, and whether engineering can produce a better deal.
Physical extension
4 MW on the floor. A fenced 0.5–1 MW pad next door.
A proposed architecture, not an operating facility. Production load and experimental plant do not share a bus. That is how you test cooling, power, and silicon claims in a hot-humid climate without pretending the lab and the colo are the same room.
Read the 5 MW conceptBring the Reality Check to your city
The public tool is the top of a funnel on purpose.
City-specific modeling. Utility analysis. Data-center strategy. R&D testbed design. Community-impact modeling. Technical advisory. The phrase is short enough for a billboard: Compute Lives Somewhere.
Work with The AI CowboysData last checked 2026-09-04 · Current public data is a snapshot, not a live meter
Show me the receipts