Skip to content

Heard vs. the record

What you may have heard. What the numbers say.

Most people only know data centers from the news. Headlines are short. These buildings are not. Each card is a common claim, then the public number behind it. We don't tell you how to vote.

You may have heard

The cloud is virtual. It lives on the internet.

4.4%of U.S. electricity in 2023

What the record says

The cloud is a building full of computers, power gear, and cooling. Your phone, your bank, the weather, and hospital records already use one. National labs track their electricity because they are real loads on the real grid.

Lawrence Berkeley National Lab, 2024 U.S. data-center energy report

You may have heard

A data center is a data center. They're all the same.

What the record says

A hospital computer room and a giant campus are both called data centers. Size, cooling, and location change power, water, noise, and land by a lot — not a rounding error. Headlines usually show the giant ones.

Lawrence Berkeley National Lab, 2024; The Green Grid

You may have heard

If it's on a list for power, it will be built.

335 MW signedvs 26,146 MW asked

What the record says

CPS Energy listed 59 projects asking for 26,146 MW. Only 335 MW was actually signed. The waiting list is real. It is not a construction schedule, and it is not your bill.

CPS Energy large-load briefing, as of 12 Jan 2026

You may have heard

Every new data center raises your electric bill.

What the record says

It depends who pays for new plants and power lines. CPS has said existing data-center contracts are written to recover costs. That is not a promise about every future project. A company asking for power is not using it yet.

CPS Energy briefings, 2026

You may have heard

Liquid cooling means it uses huge amounts of city water.

What the record says

The liquid on the computers is usually a closed loop — like coolant in a car. City water is used, or not, outside the building. A cooling tower turns water into steam. A dry cooler is more like a car radiator.

ASHRAE and The Green Grid cooling practice

You may have heard

Data centers don't use water.

What the record says

Some designs use a lot of water at a cooling tower. Others barely use any on most days. SAWS says today's data centers are about 0.1% of San Antonio drinking water — and that future recycled-water requests are much larger than today's use.

SAWS via San Antonio Report, March 2026

You may have heard

If they use recycled water, there is no water impact.

What the record says

Recycled water is still water. If a cooling tower turns it into steam, that water leaves the river system. It may spare drinking water. It still competes with other users of the recycled pipe — including power plants.

SAWS, 2026 briefings

You may have heard

Data centers create thousands of permanent jobs.

What the record says

Building one can put hundreds of people on a site for a year or two. Running one takes a small, specialized crew. Mixing those numbers is how a press release misleads a city council.

Hamm Institute workforce study, 2025 (industry benchmark, not a San Antonio payroll)

You may have heard

80% of San Antonio said no.

~80% of respondentsnot 80% of the city

What the record says

About 80% of people who filled out an opt-in survey said they opposed. That is a share of respondents, not a share of the city. Full results have not been released. Treat it as a pulse, not a census.

District 3 / Texas A&M community survey, 2026 · preliminary, opt-in

You may have heard

5 megawatts is just like 5 megawatts of houses.

What the record says

A data center can run hard all day and night. Houses peak in the evening. The “homes” number is a snapshot of how wide the power pipe is — useful for scale, not a copy of your annual bill.

ERCOT large-load materials; U.S. EIA household average

Data last checked 2026-09-04 · Current public data is a snapshot, not a live meter

Show me the receipts